North Road

Operating and Maintaining 300km for Netivei Israel

North Road

North Road Operation and Maintenance Ltd manages and operates over 270km (over 165 mile) of traffic lanes in the northern part of the country under PFI format (Private Finance Initiative).

The project, which involves rehabilitation and operation of major roads networks, spreads over a 20 year concession and focuses on rehabilitation and renewal of existing roads followed by operation and maintenance of the entire network throughout the period of the franchise. 

Company operates an operation center, patrol and control teams 24/7

The Team

mati_shaltiel

Matti Shaltiel

General Manager

  Matti joined the Derech Eretz Group in 2013 as the Operation Manager of Hacarmel Toll Tunnels. Matti assumed current position in 2019.

Prior joining the Derech Eretz Group, Matti held various managerial positions in Flextronics, a global subcontractor for complex electronic and mechanical assembly.

Matti previously served as an envoy to Chile on behalf of the Ministry of Foreign Affairs.

Matti holds an MBA in Business Administration from Ruppin Academic Center and was also certified there as a Practical Industrial Engineer and Manager.

נאיף נג'ם

Naif Najam

Engineer

Naif joined the group in 2018 as North Road leading engineer.

As part of his role as the company’s engineer Naif is also a member of several professional traffic and safety. committees in the MOT.

In his previous role Naif served as an Engineer for the Israeli Police.

Naif has M.Sc in Civil Engineering

Scroll to Top